N. Washington St. & U.S. 64 Roundabout (HN-0019)

N. Washington St. & U.S. 64 Roundabout (HN-0019)

This safety improvement project was added to the State Transportation Improvement Program (STIP) in October 2023 following the Town’s successful application for funding through the Carbon Reduction Program (CRP). The CRP aims to lower transportation-related emissions by supporting infrastructure projects that improve traffic efficiency and reduce idling time.

The project proposes converting the current five-leg intersection of U.S. 64 (West Mountain Street), U.S. 74A, and North Washington Street into a single-lane roundabout. This design will greatly enhance safety, reduce congestion, and improve traffic flow in a high-volume area near the heart of downtown.

Project Highlights:

  • Single-lane roundabout installation at the existing five-way intersection

  • Access to Hickory Street will be removed from the intersection; Hickory Street will remain accessible from North Washington Street via a new turnaround bulb

  • Expected to enhance both traffic mobility and pedestrian safety

Project Schedule:

  • Public Meeting: June 2025

  • Right-of-Way Acquisition: Spring 2026

  • Construction Begins: Summer 2027
    (All dates are subject to change based on final design and funding.)

Project Funding:

  • Right-of-Way Acquisition: $3.3 million

  • Utilities: $300,000

  • Construction: $2.9 million

  • Total Estimated Cost: $6.5 million

This project is currently in the preliminary design phase. The Town is coordinating closely with NCDOT and HDR Engineering to ensure the final plan supports local priorities and minimizes disruption during construction.

Get Involved:

Public comments are being accepted through July 16, 2025, and community input is critical at this stage. Share your thoughts or questions through the following methods:

Email: US64-US74-Improvements@publicinput.com

Phone: 984-205-6615 (enter project code 11465 to leave a message)

For more information, including interactive maps and updates on public meetings, visit the NCDOT’s Project Website at https://publicinput.com/US64-US74-Improvements

HL-0019

 

Close window